{"id":8480,"date":"2026-11-13T14:00:39","date_gmt":"2026-11-13T06:00:39","guid":{"rendered":"https:\/\/www.air-tester.com\/?p=8480"},"modified":"2026-11-13T15:20:11","modified_gmt":"2026-11-13T07:20:11","slug":"gao-jie-pai-chan-xian-qi-mi","status":"publish","type":"post","link":"https:\/\/www.air-tester.com\/en\/gao-jie-pai-chan-xian-qi-mi.html\/","title":{"rendered":"How to Perform Leak Testing on High-Throughput Production Lines? A Parallel Testing Solution Using Four-Channel Equipment and Case Study Analysis"},"content":{"rendered":"<p>On a high-speed production line,<strong>The challenge with airtightness testing is whether the testing station can keep up with the pace of the entire production line.<\/strong>. When single-channel detection becomes a bottleneck, the issue can be resolved by using multi-channel parallel detection in conjunction with custom fixtures and automation interfaces.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full is-resized\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1000\" height=\"666\" src=\"https:\/\/www.air-tester.com\/wp-content\/uploads\/2026\/10\/jing-cheng-gong-ke-qi-mi-she.png\" alt=\"The Application of Jingcheng Engineering\u2019s Airtight Equipment in Automated Workshops\" class=\"wp-image-8445\" style=\"width:1200px;height:auto\" srcset=\"https:\/\/www.air-tester.com\/wp-content\/uploads\/2026\/10\/jing-cheng-gong-ke-qi-mi-she.png 1000w, https:\/\/www.air-tester.com\/wp-content\/uploads\/2026\/10\/jing-cheng-gong-ke-qi-mi-she-18x12.png 18w, https:\/\/www.air-tester.com\/wp-content\/uploads\/2026\/10\/jing-cheng-gong-ke-qi-mi-she-600x400.png 600w\" sizes=\"(max-width: 1000px) 100vw, 1000px\" title=\"\u9ad8\u8282\u62cd\u4ea7\u7ebf\u6c14\u5bc6\u6027\u6d4b\u8bd5\u600e\u4e48\u505a\uff1f\u56db\u901a\u9053\u8bbe\u5907\u5e76\u884c\u68c0\u6d4b\u65b9\u6848\u4e0e\u6848\u4f8b\u89e3\u6790\u63d2\u56fe\" \/><figcaption class=\"wp-element-caption\"><em>Precision Engineering<a href=\"https:\/\/www.air-tester.com\/en\/product\/qmxjcsb\/dtdmfcsy\/\" data-type=\"link\" data-id=\"https:\/\/www.air-tester.com\/product\/qmxjcsb\/dtdmfcsy\/\" target=\"_blank\" rel=\"noreferrer noopener\">Multi-Channel Airtightness Tester<\/a>Applications in Automated Production Lines<\/em><\/figcaption><\/figure>\n\n\n\n<p>Using the JCGK outdoor heart rate monitor\u2019s standalone four-channel solution as an example, this article explains the device\u2019s configuration, operation, validation, and data traceability, and provides five key considerations for selection.<\/p>\n\n\n\n<h2 class=\"wp-block-heading cheese-cake\" style=\"margin-top:var(--wp--preset--spacing--70)\">I. The speed of a line is determined by its slowest station.<\/h2>\n\n\n\n<p>Imagine a production line: The upstream process sends out one product every few seconds,<strong>Single-station<a href=\"http:\/\/www.air-tester.com\/en\/\" data-type=\"link\" data-id=\"www.jcgkgw.com\" target=\"_blank\" rel=\"noreferrer noopener\">Air tightness testing station<\/a>Only one item can be tested at a time; subsequent products wait in line on the conveyor belt.<\/strong>. Whether it\u2019s new energy batteries, liquid-cooled servers, consumer electronics, automotive parts, small appliances, or medical devices\u2014any product that must pass waterproof testing before leaving the factory will sooner or later run into this roadblock.<\/p>\n\n\n\n<p>After a production line is upgraded from a single-station setup to an automated system, single-channel inspection typically reveals four issues:<strong>Long lead times for individual items; product backlog<\/strong>.;<strong>Frequent manual startup, switching, interpretation, and recording<\/strong>.;<strong>We need to test multiple products at the same time, but we only have one workstation.<\/strong>.;<strong>Data is scattered all over the place, so you have to check several records to find information on a single product.<\/strong>The<\/p>\n\n\n\n<p>So we need to rephrase the question.<strong>Don't ask, \"How can we test faster?\" Ask, \"How can we ensure testing doesn't slow down the production line?\"<\/strong>\u00a0<a href=\"http:\/\/www.air-tester.com\/en\/\" data-type=\"link\" data-id=\"www.air-tester.com\" target=\"_blank\" rel=\"noreferrer noopener\">Air tightness test equipment<\/a>Coordination among tooling, fixtures, and production processes is more effective than simply reducing inspection time.<\/p>\n\n\n\n<h2 class=\"wp-block-heading cheese-cake\" style=\"margin-top:var(--wp--preset--spacing--70)\">II. Four-Channel Parallel Processing: Breaking a Single Workstation into Four<\/h2>\n\n\n\n<p>The concept behind the multi-channel approach is straightforward:<strong>For example, with four independent channels, each of the four products occupies a separate station, where they are inspected simultaneously and evaluated individually.<\/strong>. A typical configuration consists of one<a href=\"https:\/\/www.air-tester.com\/en\/product\/qmxjcsb\/dtdmfcsy\/\" data-type=\"link\" data-id=\"https:\/\/www.air-tester.com\/product\/qmxjcsb\/dtdmfcsy\/\" target=\"_blank\" rel=\"noreferrer noopener\">Multi-Channel Airtightness Tester<\/a>A main unit, four independent channels, a four-station automated fixture set, sealing fixtures tailored to the product\u2019s structure, and startup, result output, and data management functions configured according to production line requirements.<\/p>\n\n\n\n<p>There are two ways to use it.<strong>During mass production, multiple channels are activated simultaneously.<\/strong>.;<strong>When conducting R&amp;D validation and defective product analysis, start a specific channel individually<\/strong>. Real-time pressure, test pressure, and leak data for each channel are displayed separately, and the results are evaluated independently.<\/p>\n\n\n\n<p><strong>One point must be made clear: four production lines do not mean a fourfold increase in production capacity.<\/strong>&nbsp;Clamping time, inspection cycles, fixture sealing stability, loading and unloading methods, and the cycle times of preceding and subsequent processes all place limits on production capacity. The number of lanes should be determined based on production capacity requirements and process conditions; more is not necessarily better.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th class=\"has-text-align-left\" data-align=\"left\">Comparison Items<\/th><th class=\"has-text-align-left\" data-align=\"left\">Single-channel sequential detection<\/th><th class=\"has-text-align-left\" data-align=\"left\">Four-Channel Parallel Detection<\/th><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\">Product Flow<\/td><td class=\"has-text-align-left\" data-align=\"left\">Since they enter the same workstation one after another, lines tend to form.<\/td><td class=\"has-text-align-left\" data-align=\"left\">Distributed across four workstations for simultaneous testing<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\">Start-up Method<\/td><td class=\"has-text-align-left\" data-align=\"left\">Launch One by One<\/td><td class=\"has-text-align-left\" data-align=\"left\">It can be started on a single channel or on multiple channels simultaneously.<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\">Data Presentation<\/td><td class=\"has-text-align-left\" data-align=\"left\">Single-Station Data<\/td><td class=\"has-text-align-left\" data-align=\"left\">Pressure and leak data for each channel are displayed separately<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\">Applicable Scenarios<\/td><td class=\"has-text-align-left\" data-align=\"left\">Relaxed production schedule, low output<\/td><td class=\"has-text-align-left\" data-align=\"left\">Inspection Process Becomes a Bottleneck; Continuous Batch Inspection<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading cheese-cake\" style=\"margin-top:var(--wp--preset--spacing--70)\">III. Real-World Case Study: Fully Enclosed Outdoor Heart Rate Monitor<\/h2>\n\n\n\n<p>Since this product is used outdoors, if the casing is not properly sealed, moisture will seep inside through weak spots and damage the electronic components. Given the customer\u2019s production capacity requirements, JCGK configured it with<strong>A standalone set<a href=\"https:\/\/www.air-tester.com\/en\/product\/qmxjcsb\/dtdmfcsy\/\" data-type=\"link\" data-id=\"https:\/\/www.air-tester.com\/product\/qmxjcsb\/dtdmfcsy\/\" target=\"_blank\" rel=\"noreferrer noopener\">Four-channel airtightness testing equipment<\/a><\/strong>The<\/p>\n\n\n\n<iframe src=\"\/\/player.bilibili.com\/player.html?isOutside=true&#038;aid=117590752104692&#038;bvid=BV1RhWT6BEKW&#038;cid=43483136502&#038;p=1&#038;autoplay=1\" scrolling=\"no\" border=\"0\" frameborder=\"no\" framespacing=\"0\" allowfullscreen=\"true\" style=\"width:100%;aspect-ratio:16\/9;\"> <\/iframe>\n\n\n\n<p style=\"font-size:15px\"><em>Fully Enclosed Heart Rate Monitor<a href=\"https:\/\/www.air-tester.com\/en\/product\/qmxjcsb\/dtdmfcsy\/\" data-type=\"link\" data-id=\"https:\/\/www.air-tester.com\/product\/qmxjcsb\/dtdmfcsy\/\" target=\"_blank\" rel=\"noreferrer noopener\">Four-channel airtightness testing equipment<\/a><\/em><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">One machine, four workstations<\/h3>\n\n\n\n<p>The complete set of equipment consists of<a href=\"http:\/\/www.air-tester.com\/en\/\" data-type=\"link\" data-id=\"www.air-tester.com\" target=\"_blank\" rel=\"noreferrer noopener\">Air tightness tester<\/a>The system consists of a main unit and a four-station automated fixture; each station corresponds to a separate channel, and the process begins as soon as the product is loaded into the fixture.<strong>Multiple workstations are integrated into a single piece of equipment, so products no longer have to wait in line for the same workstation.<\/strong>...and operators can manage the entire testing process from a single location.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Can be started independently, or started simultaneously<\/h3>\n\n\n\n<p>During mass production, multiple channels are activated simultaneously, resulting in high workstation utilization; during R&amp;D validation or anomaly analysis, only a single channel is activated, eliminating the need to keep all workstations running idly.<strong>A single set of equipment is suitable for both production lines and laboratories.<\/strong><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Test the good units first, then test the defective ones.<\/h3>\n\n\n\n<p>Testing in progress,<strong>The device displays the actual pressure, test pressure, and leak data for each channel in real time.<\/strong>. Once testing of a passing sample is complete, the screen displays \"PASS,\" indicating that the results meet the customer's preset acceptance criteria. Subsequently, when a defective sample is placed in the fixture and the leakage data exceeds the set range, the equipment immediately displays \"Out of Limits.\"<\/p>\n\n\n\n<p>This step does not validate the product, but rather the testing protocol:<strong>Can it distinguish between good and bad items?<\/strong>&nbsp;The specific test pressure, leakage limits, test duration, and acceptance criteria shall be determined based on the customer\u2019s product technical requirements and the results of process validation.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Data is stored, can be exported, and can be traced<\/h3>\n\n\n\n<p><strong>The solution supports the storage and export of historical data.<\/strong>...production staff can review records and verify results, and quality analysis is supported by data. If the production line has further IT needs,<strong>Barcode Linkage, Data Interfaces, and MES Integration<\/strong>...This can be evaluated separately based on equipment configuration and project requirements.<\/p>\n\n\n\n<h2 class=\"wp-block-heading cheese-cake\" style=\"margin-top:var(--wp--preset--spacing--70)\">IV. What Makes This Solution Good?<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Parallel Testing Reduces Wait Times<\/strong><\/h3>\n\n\n\n<p><strong>Multiple channels operating simultaneously<\/strong>... By focusing on processes with concentrated inspection tasks and large batch sizes, processing capacity is consequently increased.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Independent channels, flexible scheduling<\/strong><\/h3>\n\n\n\n<p><strong>Each channel is activated and evaluated independently.<\/strong>, Mass production and individual verification do not interfere with one another.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>The right gear determines half the result<\/strong><\/h3>\n\n\n\n<p>The reliability of airtightness testing depends equally on the instrument and the test fixture:<strong>Product positioning, seal design, clamping method, and consistency in repeated clamping can all affect the readings.<\/strong>. Designing sealing fixtures tailored to different product structures can reduce errors caused by unstable clamping and improper sealing.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>The data is available, and there is room for improvement.<\/strong><\/h3>\n\n\n\n<p><strong>Historical data can be stored and exported<\/strong>; When upgrading the production line, automation solutions such as robotic loading\/unloading and PLC control can be evaluated based on project requirements; this case study also allows for future upgrades that incorporate robotic arms.<\/p>\n\n\n\n<h2 class=\"wp-block-heading cheese-cake\" style=\"margin-top:var(--wp--preset--spacing--70)\">V. High Tempo<a href=\"http:\/\/www.air-tester.com\/en\/\" data-type=\"link\" data-id=\"www.air-tester.com\" target=\"_blank\" rel=\"noreferrer noopener\">airtight equipment<\/a>How to Choose the Right Model: Five Key Factors to Consider<\/h2>\n\n\n\n<p>Not all production lines require multiple channels. When deciding whether to choose a single channel, dual channels, four channels, or more, you need to consider the product, process, and production capacity together.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th class=\"has-text-align-left\" data-align=\"left\">Selection Criteria<\/th><th class=\"has-text-align-left\" data-align=\"left\">What needs to be confirmed?<\/th><th class=\"has-text-align-left\" data-align=\"left\">Common Pitfalls<\/th><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\">Product Testing Requirements<\/td><td class=\"has-text-align-left\" data-align=\"left\">Sealing Design, Test Pressure, Permissible Leakage Rate, Testing Method, Acceptance Criteria<\/td><td class=\"has-text-align-left\" data-align=\"left\">Electronic enclosures, connectors, valve bodies, and piping assemblies vary greatly; their design principles and tooling cannot be directly applied.<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\">Actual Production Cycle Time<\/td><td class=\"has-text-align-left\" data-align=\"left\">Total cycle time for clamping, sealing, inflation, balancing, inspection, venting, and part removal<\/td><td class=\"has-text-align-left\" data-align=\"left\">Consider only the instrument\u2019s rated testing time; if the bottleneck lies in manual loading or in preceding or subsequent processes, adding channels will not solve the problem.<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\">Channels and Operating Modes<\/td><td class=\"has-text-align-left\" data-align=\"left\">Number of channels, independent startup, simultaneous startup, independent detection, isolation of faulty channels<\/td><td class=\"has-text-align-left\" data-align=\"left\">The number of lanes doesn't match production capacity\u2014buy too many and they sit idle; buy too few and people still have to wait in line.<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\">Fitting and Sealing Stability<\/td><td class=\"has-text-align-left\" data-align=\"left\">Alignment, wear on sealing surfaces, clamping force, rapid loading and unloading, durability, ease of maintenance<\/td><td class=\"has-text-align-left\" data-align=\"left\">Compare only the machine specifications; ignore the repeatability of the fixtures.<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\">Data and Automation Expansion<\/td><td class=\"has-text-align-left\" data-align=\"left\">Data Logging, Data Export, Result Signal Output, Robot, PLC, and MES Integration<\/td><td class=\"has-text-align-left\" data-align=\"left\">Failure to reserve interfaces early on leads to repeated modifications during later upgrades.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading cheese-cake\" style=\"margin-top:var(--wp--preset--spacing--70)\">VI. Quick Q&amp;A<\/h2>\n\n\n\n<p><strong>Q1: Is it necessary to use a high-cycle production line?<a href=\"https:\/\/www.air-tester.com\/en\/product\/qmxjcsb\/dtdmfcsy\/\" data-type=\"link\" data-id=\"https:\/\/www.air-tester.com\/product\/qmxjcsb\/dtdmfcsy\/\" target=\"_blank\" rel=\"noreferrer noopener\">Multi-Channel Airtightness Tester<\/a>Right?<\/strong><br><strong>Not necessarily<\/strong>. If the inspection cycle time for a single channel meets the production rhythm, a single channel is sufficient. Only when the inspection process becomes a bottleneck should you consider a dual-channel, quad-channel, or multi-channel system.<\/p>\n\n\n\n<p><strong>Q2: Can a four-channel device inspect four products at the same time?<\/strong><br><strong>Sure<\/strong>. The equipment featured in this case study employs an independent four-channel design that supports both individual channel activation and simultaneous activation of multiple channels; the specific operating mode is subject to the equipment configuration and testing procedures.<\/p>\n\n\n\n<p><strong>Q3: Are multi-channel devices suitable for R&amp;D validation and defective product detection?<\/strong><br><strong>Suitable for<\/strong>. The independent channel allows defective samples to be placed separately to observe whether leakage data exceeds the limit, thereby verifying the system's classification capability; it can also test multiple samples simultaneously, making it suitable for parallel validation during the R&amp;D phase.<\/p>\n\n\n\n<p><strong>Q4: Can a robotic arm be integrated later?<\/strong><br><strong>Can be evaluated based on automation project requirements<\/strong>. The coordination plan between the robot and the inspection equipment should be determined based on the product loading and unloading methods, fixture design, equipment control interfaces, and available floor space.<\/p>\n\n\n\n<p><strong>Q5: How can we ensure reliable inspection results at high production rates?<\/strong><br><strong>Based on validation, not on the number of channels<\/strong>. Verify the test pressure, leak detection criteria, fixture sealing stability, test repeatability, and the ability to distinguish between\u5408\u683c products and known defective products; for multi-channel equipment, also verify the independence and consistency among the channels.<\/p>\n\n\n\n<h2 class=\"wp-block-heading cheese-cake\" style=\"margin-top:var(--wp--preset--spacing--70)\">Conclusion<\/h2>\n\n\n\n<p>Leak and water resistance testing on high-speed production lines is not simply a matter of replacing a single channel with multiple channels; rather, it requires<strong>Develop a comprehensive plan covering everything from inspection requirements, overall production rhythm, tooling and fixtures, access control, and data management to automation upgrades.<\/strong>The<\/p>\n\n\n\n<p>Case Study: JCGK's Outdoor, Fully Enclosed Heart Rate Monitor,<strong>Using independent<a href=\"https:\/\/www.air-tester.com\/en\/product\/qmxjcsb\/dtdmfcsy\/\" data-type=\"link\" data-id=\"https:\/\/www.air-tester.com\/product\/qmxjcsb\/dtdmfcsy\/\" target=\"_blank\" rel=\"noreferrer noopener\">Four-channel airtightness tester<\/a>Equipped with a four-station automated fixture, it enables independent single-channel startup, synchronized multi-channel testing, real-time data display, defective product verification, and the storage and export of historical data.<\/strong>. For mass-production leak testing applications in sectors such as new energy, liquid cooling, automotive parts, and consumer electronics, multi-channel solutions can be evaluated based on actual production capacity and process requirements.<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p style=\"font-size:16px\"><strong><a href=\"http:\/\/www.air-tester.com\/en\/\" data-type=\"link\" data-id=\"www.air-tester.com\" target=\"_blank\" rel=\"noreferrer noopener\">Shenzhen Jingchenggongke Technology Co., Ltd.<\/a>(JCGK)<\/strong>\u00a0Focus<a href=\"http:\/\/www.air-tester.com\/en\/\" data-type=\"link\" data-id=\"www.air-tester.com\" target=\"_blank\" rel=\"noreferrer noopener\">Air tightness testing equipment<\/a>and comprehensive solutions tailored to product structure, testing standards, and production line cycle times, providing<a href=\"http:\/\/www.air-tester.com\/en\/\" data-type=\"link\" data-id=\"www.air-tester.com\" target=\"_blank\" rel=\"noreferrer noopener\">airtight instruments<\/a>, custom tooling, multi-channel systems, and automation integration services. If you\u2019d like to evaluate a multi-channel solution or receive recommendations for production line upgrades, please contact the Jingcheng Engineering team for a free, one-on-one technical consultation.<\/p>\n<\/blockquote>","protected":false},"excerpt":{"rendered":"<p>Using Jingcheng Engineering\u2019s independent four-channel airtightness testing solution for outdoor heart rate monitors as an example, this article points out that the key to high-tempo production lines is not \u201cfaster testing,\u201d but ensuring that testing does not slow down the production line. The article clearly explains equipment configuration, operating procedures, and validation criteria, emphasizing that test fixtures determine half the outcome and that four channels do not equate to a fourfold increase in production capacity. It also outlines five key selection criteria: product requirements, actual production cycle time, channel configuration, fixture stability, and data scalability. Finally, it makes it clear that reliable results depend on validation, not on the number of channels.<\/p>","protected":false},"author":1,"featured_media":8445,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[28],"tags":[210,39],"class_list":["post-8480","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industrynews","tag-qi-mi-xing-ce-shi-yi","tag-39"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.air-tester.com\/en\/wp-json\/wp\/v2\/posts\/8480","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.air-tester.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.air-tester.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.air-tester.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.air-tester.com\/en\/wp-json\/wp\/v2\/comments?post=8480"}],"version-history":[{"count":0,"href":"https:\/\/www.air-tester.com\/en\/wp-json\/wp\/v2\/posts\/8480\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.air-tester.com\/en\/wp-json\/wp\/v2\/media\/8445"}],"wp:attachment":[{"href":"https:\/\/www.air-tester.com\/en\/wp-json\/wp\/v2\/media?parent=8480"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.air-tester.com\/en\/wp-json\/wp\/v2\/categories?post=8480"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.air-tester.com\/en\/wp-json\/wp\/v2\/tags?post=8480"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}